Bitumen 20-30

Bitumen 20-30 which is obtained by performing aeration process on vacuum baton (raw material of bitumen production which is taken from the bottom of distillation tower in vacuum of oil refineries) in bitumen production units and degree of permeability (determination of stiffness) Bitumen) it should be between 20 and 30.